KEK e+/e- Linac Trigger Timing Information
[Old Page]
Recent Information
Signal Connection Diagram
Main Trigger Station schem
Main Trigger Station
  2024/11/05 ~
  
  ~ 2024/11/05
  
  ~ 2024/08/09
  
  ~ 2024/08/06
  
  ~ 2024/07/16
  
  ~ 2022/09/20
  
  ~ 2022/02/16
  
   ~ 2021/11/10
  
  ~ 2021/09/30
  
  ~ 2021/09/17
  
  ~ 2021/05/06
  
  ~ 2021/04/14
  
  ~ 2021/01/06
  
  ~ 2020/09/14
  
  ~ 2020/01/22
  
  2019/09/17 ~
  
  ~ 2019/05/30
  
  ~ 2019/05/29
  
  ~ 2018/11/07
  
  ~ 2018/05/07
  
  ~ 2018/01/30
  
  ~ 2018/01/10
  
  ~ 2017/11/20
  
  ~ 2017/03/28
  
  ~ 2017/01/13
  
  ~ 2016/09/16
  
  ~ 2016/04/01
  
  ~ 2016/02/12
  
  ~ 2016/02/02
  
  ~ 2016/01/18
  
  ~ 2015/11/24
  
  ~ 2015/11
  
  ~ 2015/05
  
  ~ 2015/03
  
  ~ 2014/10
  
  ~ 2013/08
  
  ~ 2013/07 
  
  ~ 2013/03 
  
  ~ 2012/12 
  
  ~ 2012/07 
  
  ~ 2012/06 
  
  ~ 2011 
  
  ~ 2010 
  
  ~ 2007 
  
  ~ 2001 
  
  ~ 1999 
  
GU_AT HV-ST
2016/09 ~
~ 2016/09 
ABC Sub Control Room
Sub booster
5-Sector Sub Control Room
Cable Connections
Rack Configuration
Main Trigger Station Rack1
ABC Sub-control
Timing Synchronization Circuit Diagram and 
Memo for PF Ring (Sep.2005)
Timing Signals to PF Ring
Timing Signal to Pulse Coil FP_21_T
Linac Trigger Database
Linac Camac Module List
 
[Please Comment on This Page]
<webmaster@mail-linac.kek.jp> , Linac, KEK,
Oct.20.2000 - Dec.11.2005.
[ Timing Another ] 
[ Control ] 
[ Linac ] 
[ Accelerator ] 
[ KEK ]