Date |
Reporter |
Title |
Files |
2009/12/04 |
T.Higo |
KEK status |
|
G.Riddone |
CERN production |
|
A.Olyunin |
Broad X-band high power load H-02 for SLAC Final RF test results |
|
2009/11/27 |
S.Atieh G.Riddone |
Machining process for disk damped cells Actions |
|
T.Takatomi T.Higo |
Machining process for disk damped cell taking the example of TD18 #2,#3 |
|
2009/11/26 |
F.Wang |
T24 High Power Test Result |
|
G.Riddone |
T24 structure fabrication |
|
A.Toerklep G.Arnau Izquieldo |
T24-11WNSDvg1.8Cu Post mortem SEM inspection |
|
2009/09/25 |
T.Higo |
KEK status |
|
G.Riddone |
CLIC structure collaboration WebEx meeting CERN production |
|
2009/08/28 |
T.Higo |
KEK status |
|
G.Riddone |
CLIC structure collaboration WebEx meeting CERN production |
|
T24 structure fabrication |
|
2009/06/26 |
T.Higo |
KEK status |
|
G.Riddone |
CLIC RF structure production |
|
J.Wang |
Report from SLAC |
|
M.Gerbaux R.Zennaro A.Olyunin |
A history of the RF measurement performed on the T24_vg18_disk structure |
|
2009/05/29 |
T.Higo and K.Ueno |
KEK status |
|
2009/04/24 |
T.Higo and Nextef group |
T18_VG24_Disk_#2 processing(11) |
|
K.Ueno |
X band structure manufacturing status at KEK |
|
J.Wang |
Report from SLAC |
|
  |
Dark Current Spectrum |
|
2009/03/27 |
K.Ueno |
X band structure manufacturing status at KEK |
|
G.Riddone |
EDMS Number & Id |
|
G.Riddone |
Structure Master Schedule and CERN production status |
|
J.Wang |
Report from SLAC |
|
2009/02/27 |
G.Riddone |
Structure Master Schedule and CERN production status |
|
S.Matsumoto |
Nextef status |
|
Ueno |
On X band structure manufacturing status at KEK |
|
J.Wang |
Report from SLAC |
|
T.Higo K.Yokoyama J.Zhang T.Takatomi Y.Watanabe |
TD18_VG24_Quad_#5(1) S-parameter as of machined |
|
  |
X-band Structure Master Schedule |
|
X-band Structure Master Schedule |
|
2009/01/29 |
T.Higo |
KEK status |
|
S.Matsumoto |
Nextef status and plan |
|