Collaboration Meeting 2009

Date Reporter Title Files
2009/12/04 T.Higo KEK status
G.Riddone CERN production
A.Olyunin Broad X-band high power load H-02 for SLAC
Final RF test results
2009/11/27 S.Atieh
G.Riddone
Machining process for disk damped cells Actions
T.Takatomi
T.Higo
Machining process for disk damped cell
taking the example of TD18 #2,#3
2009/11/26 F.Wang T24 High Power Test Result
G.Riddone T24 structure fabrication
A.Toerklep
G.Arnau Izquieldo
T24-11WNSDvg1.8Cu
Post mortem SEM inspection
2009/09/25 T.Higo KEK status
G.Riddone CLIC structure collaboration WebEx meeting CERN production
2009/08/28 T.Higo KEK status
G.Riddone CLIC structure collaboration WebEx meeting CERN production
T24 structure fabrication
2009/06/26 T.Higo KEK status
G.Riddone CLIC RF structure production
J.Wang Report from SLAC
M.Gerbaux
R.Zennaro
A.Olyunin
A history of the RF measurement performed
on the T24_vg18_disk structure
2009/05/29 T.Higo and
K.Ueno
KEK status
2009/04/24 T.Higo and
Nextef group
T18_VG24_Disk_#2 processing(11)
K.Ueno X band structure manufacturing status at KEK
J.Wang Report from SLAC
  Dark Current Spectrum
2009/03/27 K.Ueno X band structure manufacturing status at KEK
G.Riddone EDMS Number & Id
G.Riddone Structure Master Schedule and
CERN production status
J.Wang Report from SLAC
2009/02/27 G.Riddone Structure Master Schedule and
CERN production status
S.Matsumoto Nextef status
Ueno On X band structure manufacturing status at KEK
J.Wang Report from SLAC
T.Higo
K.Yokoyama
J.Zhang
T.Takatomi
Y.Watanabe
TD18_VG24_Quad_#5(1)
S-parameter as of machined
  X-band Structure Master Schedule
X-band Structure Master Schedule
2009/01/29 T.Higo KEK status
S.Matsumoto Nextef status and plan

Contact person: kurasina@kek.jp