Nakamoto, T.

Paper Title Page
WOMGA05 Design of a high field Nb3Al common coil magnet for LHC upgrade 429
 
  • Q. Xu, K. Sasaki, T. Nakamoto, A. Terashima, K. Tsuchiya, A. Yamamoto
    高エネルギー加速器研究機構
  • A. Kikuchi, T. Takeuchi
    物質・材料研究機構
 
 

A high field Nb3Al/Nb3Sn combined magnet is under development, as a R&D for LHC upgrade. There are totally 5 superconducting coils with a common coil configuration in this magnet,3 Nb3Al coils sandwiching 2 Nb3Sn coils. The peak field is 13.2T for the Nb3Al coils and 11.9T for the Nb3Sn coils. Shell structure was adopted in the mechanical design. This paper presents the detail.

 
WOMGA01 ニュートリノビームライン超伝導複合磁場磁石システムのコミッショニング 412
 
  • T. Ogitsu, Y. Ajima, Y. Fujii, T. Hasegawa, N. Higashi, T. Ishii, M. Iida, N. Kimura, T. Kobayashi, Y. Makida, T. Nakadaira, T. Nakamoto, H. Ohhata, T. Okamura, K. Sakashita, K. Sasaki, M. Shibata, K. Tanaka, A. Terashima, T. Tomaru, A. Yamamoto
    高エネルギー加速器研究機構
  • A. Ichikawa
    京都大学
  • H. Kakuno, N. Hasting
    東京大学
 
 

J-PARCニュートリノビームラインではメインリングから出射した陽子ビームを神岡方向に曲げるためのビームラインに全長150mの超伝導磁石システムを用いている。このシステムでは実用超伝導磁石では世界初となる単層の左右非対称コイルを用いた複合磁場磁石が用いられている。システムは平成20年の12月に現地工事を完成し、翌年1月から3月の間にハードウェアコミッショニング、4月から5月にかけてビームコミッショニングを行った。コミッションニングの結果ほとんどのハードウェアがほぼ期待通りの振る舞いをしていることが確認され、秋以降からの本格運用に向けて必要な性能確認が行えた。本講演ではシステムのコミッショニングの結果について主に複合磁場磁石の性能試験を中心に報告を行う。