A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   R   S   T   U   V   W   X   Y   Z  

Nakadaira, T.

Paper Title Page
WPBTA04 Beam Injection and Fast Extraction Tuning of J-PARC MR 307
 
  • G. Wei, T. Koseki, S. Igarashi, M. Tomizawa, K. Ishii, A. Ando, M. Uota, M. Shirakata, J. Takano, K. Satou, Y. Hashimoto, K. Fan, N. Hatakeyama, N. Kamikubota, T. Nakadaira
    高エネルギー加速器研究機構
  • H. Harada, P. Saha
    日本原子力研究開発機構
  • J. Tang
    Institute of High Energy Physics, China
 
 

The beam commissioning of J-PARC MR has been started from May 2008 and is in progress. As usual, injection is in the very first stage and strongly related to other parts of MR commissioning including the extractions, fast extraction to neutrino beam line, where extracted beams finally reflect the overall commissioning result. The tuning of MR injection and fast extraction will be described here.

 
WOMGA01 ニュートリノビームライン超伝導複合磁場磁石システムのコミッショニング 412
 
  • T. Ogitsu, Y. Ajima, Y. Fujii, T. Hasegawa, N. Higashi, T. Ishii, M. Iida, N. Kimura, T. Kobayashi, Y. Makida, T. Nakadaira, T. Nakamoto, H. Ohhata, T. Okamura, K. Sakashita, K. Sasaki, M. Shibata, K. Tanaka, A. Terashima, T. Tomaru, A. Yamamoto
    高エネルギー加速器研究機構
  • A. Ichikawa
    京都大学
  • H. Kakuno, N. Hasting
    東京大学
 
 

J-PARCニュートリノビームラインではメインリングから出射した陽子ビームを神岡方向に曲げるためのビームラインに全長150mの超伝導磁石システムを用いている。このシステムでは実用超伝導磁石では世界初となる単層の左右非対称コイルを用いた複合磁場磁石が用いられている。システムは平成20年の12月に現地工事を完成し、翌年1月から3月の間にハードウェアコミッショニング、4月から5月にかけてビームコミッショニングを行った。コミッションニングの結果ほとんどのハードウェアがほぼ期待通りの振る舞いをしていることが確認され、秋以降からの本格運用に向けて必要な性能確認が行えた。本講演ではシステムのコミッショニングの結果について主に複合磁場磁石の性能試験を中心に報告を行う。