A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   R   S   T   U   V   W   X   Y   Z  

Hatakeyama, N.

Paper Title Page
WPBTA04 Beam Injection and Fast Extraction Tuning of J-PARC MR 307
 
  • G. Wei, T. Koseki, S. Igarashi, M. Tomizawa, K. Ishii, A. Ando, M. Uota, M. Shirakata, J. Takano, K. Satou, Y. Hashimoto, K. Fan, N. Hatakeyama, N. Kamikubota, T. Nakadaira
    高エネルギー加速器研究機構
  • H. Harada, P. Saha
    日本原子力研究開発機構
  • J. Tang
    Institute of High Energy Physics, China
 
 

The beam commissioning of J-PARC MR has been started from May 2008 and is in progress. As usual, injection is in the very first stage and strongly related to other parts of MR commissioning including the extractions, fast extraction to neutrino beam line, where extracted beams finally reflect the overall commissioning result. The tuning of MR injection and fast extraction will be described here.